Civil / Infrastructure

SDB Inc Civil Division Images

Whether your project requires a full service Civil General Contractor, a specialized grading, paving or underground civil subcontractor, or a partner in Design-Build projects, SDB Civil is your solution. We have the expertise, equipment, personnel and the general contracting experience to handle full service site development packages with ease and efficiency. SDB Civil offers turn-key construction services including pre-construction, design assist, project management, project procurement, risk analysis, and construction as your needs require. At SDB Civil, our goal is to simplify the complexities of construction for our clients so that the process is efficient and rewarding.

Share |
Head of screw

Civil Division

Head of screw
  • Pre-construction services
  • General contracting
  • Site utilities, grading & paving
  • Full service site development
  • Infrastructure improvement

Delivery Methods:

  • Job order contracting
  • Design-build
  • Construction manager at risk
Head of screwHead of screw

Sample Projects:

city of phoenix logo
desert broom park
Read More

Desert Broom Park

City of Phoenix

SDB was contracted to perform preconstruction, design and general contracting services for this 4 acre park as part of the CMAR team selected by the City of Phoenix.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • CMAR
  • 4 Acres
  • December 2007
  • $2,950,000
  • Olsson & Associates
Sky Harbor Logo
sky harbor 30 mlb tank

Sky Harbor 20 Inch Transmission Main T2-T3

Arizona Fueling Facilities Corp.

SDB Civil Corporation provided complete installation, testing and flushing services for the installation of over 2,600 LF of 20" fuel pipeline at Phoenix Sky Harbor International Airport. The project included construction of two new isolation valve pits for future airport expansion, and one new isolation valve pit for fuel flow control. The pipeline was constructed adjacent to active taxi-ways, under traffic control utilities and involved the jack-and-bore of the 20" pipeline under two active taxiways.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Engineer:
  • Design-Bid-Build
  • 2,600 LF
  • April 2006
  • $1,900,000
  • Argus Consulting (Design) / Stantec (Const. Mgr.)
city of sedona logo
sedona wastewater reclamation plant

Wastewater Reclamation Plant Upgrades

City of Sedona

This project consisted of miscellaneous upgrades to the existing wastewater reclamation facility in the City of Sedona.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Engineer:
  • CMAR
  • 10 acres
  • October 2007
  • $1,925,600
  • CH2MHill Arizona
Sky Harbor Logo
sky harbor 30 mlb tank

Range Rider Reservoir

City of Mesa

SDB Civil performed the demolition and removal of the existing reservoir in preparation for construction and start-up of a new 500,000 gallon concrete reservoir. The project called for the use of 24" water piping, vertical turbine pumps and associated piping, electrical equipment, chlorination equipment, new emergency generator and other miscellaneous site work.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Engineer:
  • Design-Bid-Build
  • 5 Acres
  • January 2006
  • $1,402,000
  • Dibble & Associates
Central Arizona Project Logo
Central Arizona Project Canal

Dual Water Lines

Central Arizona Project

This project consisted of complete installation of over 13,000 linear feet of 4 inch and 12,000 linear feet of 16 inch PVC waterline along the Central Arizona Project Canal. The water-line was constructed from the existing City of Phoenix Tramanto Pump station, extending along the CAP canal, across Happy Valley Road, and terminating at the Central Arizona Project corporate headquarters. SDB Civil provided complete pipeline excavation, bedding, installation, backfill and testing services.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Engineer:
  • Qualification
  • 10 acres
  • January 2007
  • $1,364,000
  • CSA Engineering
Sky Harbor Logo
sky harbor 30 mlb tank
Read More

Sky Harbor 30 MBL Tank Addition

Arizona Fueling Facilities Corp.

This project involved the new construction of an above ground fuel storage tank and all associated piping. SDB was subcontracted by POND Constructors to provide, install and test all fuel, fireline, and storm-drain piping for this new tank addition. SDB also provided all hot-tap and live fuel line tie-in's to make the tank active upon completion. The project was completed in February 2008, and was featured in Airport Improvement Magazine in October of 2009.

  • Delivery Method:
  • Completed:
  • Budget:
  • Engineer:
  • Design-Bid-Build
  • February 2008
  • $500,000
  • POND Constructors
Scottsdale Unified School District
Apache Elementary School Bus Parking Lot

Apache Elementary School Bus Parking Lot

Scottsdale Unified School District

The district needed a bus lot with an increased capacity yard to serve the new bus fleet additions. The project was multi-phased so that daily bus operations could be maintained while the project was under construction. The project scope included a complete demolition of the existing parking lot and construction of a new bus yard.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • Negotiated
  • 50,000 SF
  • November 2005
  • $245,000
  • Hess Roundtree, Inc.

Copyright 2012, SDB, inc. All rights reserved.