High-Tech Projects

High Tech projects by SDB inc

SDB's roots are firmly planted in the high-tech industry. Since the company's inception in 1980 we have established ourselves as a leader in this specialized industry. We continue to work at our client's high-tech facilities constructing clean rooms, labs and working with strict containment construction and safety methods. SDB has been awarded numerous awards in this industry and we continue to set a standard for excellence in high-tech facility construction.

Share |
Head of screw

High Tech Clients:

Head of screw
  • Microsemi

  • World's largest chip manufacturer, located in Chandler Arizona

  • Microphotonix

  • Rodel

Head of screwHead of screw
  • Microsemi Logo
  • Rodel Logo

Sample Projects:

ASU Logo
ASU Mercado Nursing Simulation Lab

Clean Room Construction and Renovation

Microsemi

Constructed a 5,500 SF class 10/100 clean room lab, central plant upgrades and process system upgrades.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • Negotiated
  • 5500 SF
  • December 2007
  • $7,400,000
  • SDB, Inc.
Microphotonix cleanroom

Microphotonix Cleanroom

Microphotonix

State of the Art class 10/100 Design/Build clean room. Project consisted of building world class cleanroom inside of an existing wood structured building. Included: particle and humidity isolation, a new central plant, new service entrance system, Deionized Water production facility, wastewater treatment plant and monitoring, DDC controls, EPA permitting, tool rigging and installation, and cleanroom certification.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • Negotiated Design-Build
  • 4,500 SF (1,000 SF class 10; 3,500 SF class 100)
  • 2002
  • $5,700,000
  • Dieterich Architectural Group, Inc.
Rodel
Rodel

Rodel Cleanroom

Rodel Corporation

State of the Art class 10/100 clean room for Research and Development for an Intel supporting vendor. Additional services included the demolition of existing facility, particle and humidity isolation, a new central plant, new service entrance section, Deionized Water production facility, wastewater treatment plant and monitoring, DDC controls, EPA permitting, tool rigging and installation, and cleanroom certification.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • Negotiated Design/Build
  • 4,500 SF (2,000 SF class 10; 2,500 SF class 100)
  • 2001
  • $5,400,000
  • Dieterich Architectural Group, Inc.

Copyright 2012, SDB, inc. All rights reserved.