Healthcare Projects

Health Care Project images

SDB's diverse range of experience includes hundreds of hospital and healthcare facility projects. SDB is trained on the processes required for working at active healthcare facilities factoring safety, health hazards and construction methods such as dust control, HEPA filtration, transition areas, negative air pressure and more. We have extensive experience in hospital construction logistics, having worked directly on over 300 hospital and healthcare projects.

Share |
Head of screw

Healthcare Clients:

Head of screw
  • Maricopa Integrated Health System

  • Arizona Department of Veterans' Services

  • Chicanos Por La Causa

  • Arizona State University

  • Cigna

Head of screwHead of screw
  • MIHS logo
  • Arizona State Univeristy Logo
  • Arizona Department of Veterans' Services Logo
  • Chicanos Por La Causa logo
  • Cigna Logo

Sample Projects:

Arizona Department of Veterans' Services Logo
Rendering of the Tucson Veteran's Home
Read More

Tucson Veteran's Home

Arizona Veterans Services - Tucson, AZ

The project is the second of its kind in the State of Arizona. The ±130,000 square foot LEED facility will house up to 120 occupants with accommodations such as single dwelling units, activity rooms, common dining areas, rehabilitation facility and outdoor courtyard space. Veteran Services of Arizona awarded the $28 million Design-Build construction to Haydon Building Corporation/SDB Inc. Joint Venture.

  • Delivery Method:
  • Size:
  • Scheduled Completion:
  • Budget:
  • Architect:
  • Design-Build
  • 130,000 SF
  • August 2011
  • $28,000,000
  • Orcutt/Winslow
MIHS logo

Emergency Room, Triage Dept. & 12 Exam Room Remodel

Maricopa Integrated Health System

Remodel and renovation of Emergency and Triage reception and waiting rooms, twelve examination rooms, nurse station, guard station and various patient areas at the Maricopa Medical Center in Phoenix, Arizona.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • CMAR
  • 6,000+ SF
  • June 2009
  • $990,000
  • Gentec
cigna logo
cigna building, Gilbert az

San Tan Healthcare Tenant Improvement

Cigna Healthcare

SDB was contracted to build out a 3,525 SF tenant improvement for CIGNA Healthcare at the Copper Point Center. The space was delivered in gray shell condition. Improvements added were 3 offices, 4 examination rooms, waiting room, phlebotomy lab, clean room, reception desk, medical records storage room, nurse station and a pharmacy.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • Design-Bid-Build
  • 3525 SF
  • February 2009
  • $381,000
  • TriArch Architecture & Design
Maricopa Integrated Health System Logo
Maricopa Medical Center Pharmacy Clean Room

Pharmacy Clean Room

Maricopa Integrated Health System

Converted storage space into pharmacy, lab space and surplus plasma storage facilities at the Maricopa Medical Center in Phoenix, AZ.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • CMAR
  • 1,200 SF
  • September 2008
  • $314,000
  • Gentec
ASU Logo
ASU Mercado Nursing Simulation Lab

Mercado Nursing Simulation Lab

Arizona State University

Remodel of an existing space into a nursing simulation laboratory.

  • Delivery Method:
  • Completed:
  • Budget:
  • Architect:
  • Job Order Contract (JOC)
  • July 2010
  • $291,000
  • Fore Dimensions
Maricopa Integrated Health System Logo
Maricopa Medical Center

Clean Agent System for IT Server Room

Maricopa Integrated Health System

Construction of Clean Agent Fire Suppression system for IT server room at the Maricopa Medical Center in Phoenix, AZ.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • CMAR
  • 2,400 SF
  • August 2008
  • $213,000
  • Orcutt-Winslow
cigna logo
cigna building, Mesa az

Stapley Healthcare Tenant Improvement

Cigna Healthcare

SDB was contracted to build out a 20,000 SF tenant improvement for CIGNA Healthcare at the Stapley Corporate Center. The space was delivered in shell condition. Improvements added were offices, examination rooms, a waiting room and a pharmacy lab.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • Design-Bid-Build
  • 20,000 SF
  • September 2007
  • $2,195,000
  • Westlake Reed Leskosky
Chicanos Por La Causa logo
Corazon Treatment Center

Corazon Treatment Facility

Chicanos Por La Causa, Inc.

Existing dwelling units were demolished and removed to make room for this ground-up expansion project. The 17,000 SF building houses patients on the second floor with administrative offices, common areas and a kitchen on the first floor.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • Design-Bid-Build
  • 11,832 SF
  • February 2009
  • $1,600,000
  • David Ortega Architect & Associates, Inc.
Maricopa Integrated Health System Logo
Maricopa Medical Center

Relocation of Education Classrooms and Warehouse Conversion

Maricopa Integrated Health System

Converted warehouse space into offices and classrooms for nurse and facility training use. Work was performed during active hospital hours with an emphasis on minimizing facility interruption.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • CMAR
  • 17,600 SF
  • June 2008
  • $619,000

Copyright 2012, SDB, inc. All rights reserved.